Our EXPERIENCES

Startup-Standby Transformer: Sistem proteksi trafo untuk mendeteksi terhadap efek dari kondisi-kondisi tertentu

PT. EMKA Rekayasa Energi many have Experiences Like Supervisi Konstruksi, Power Plant etc

1. STUDY & DESIGN

  • Pre- Feasibility Study for Independent Power Prod ucer (IPP) of Muara Enim CFSPP 2×135 MW. Project of PT.Truba Alam Manunggal energy (TAME).
  • Consultancy Services for Power Purchase Agreement (PPA) evaluation belongs to PT. Antam tbk.
  • Consultancy Services for Feasibility Study of Tahuna CFSPP 2×7 MW, Selayar CFSPP 2×7 MW, Moutong CFSPP 2×4 MW. Project of PT. PLN (Persero).
  • Re-route & engineering design for Transmission 150 kV & Tanjung Uncang Substation. Project of PT. PLN Otorita batam
  • Basic Design for Construction of Kendari CFSPP (1×10 MW) unit III. Project of PT. Hutama Karya.

2.   PROCUREMENT PROJECT

  • Preparation for procurement document of boiler add on LATI CFSPP 2×7 MW, along with bidding assistancy. Project of PT. Indo Pusaka berau subsidiary of PT. Indonesia Power.
  • Procurement for SCW and H2 Panel recommended parts of Tanjung jati B CFSPP. Project of PT. TJB
  • Procurement for HVAC spare part (motor fan & compressor) of Tanjung jati B CFSPP. Project of PT. TJB.
  • Procurement for Combuster basket of Pesanggaran Gas Turbine Generated power Plant. Project of Bali Business production Unit (UBP) PT. Indonesia Power.

3.  OWNER’S ENGINEER IN THE MANAGEMENT & SUPERVISORY TASK

  • Management Consultancy Services for Construction administration Cilegon Combined Cycle Power Plant (PLTGU). Project of Cilegon Business Production Unit (UBP) PT. Indonesia Power
  • Consultancy Services for QAQC and Construction Supervision of Central Java II (Cilacap)CFSPP 1×600 MW. Project of PT. PLN (Persero) Head Office
  • Consultancy Services for QAQC and Construction supervision of East Java II (Paiton baru) CFSPP lx 660 MW. Project of PT. PLN (Persero) Head Office
  • Consultancy Services for Construction Supervision ofNTT-l(Erxte)CFSPP2x7MW.PrqjectafFTPLN(Persero)
  • Project Management Services for construction of Jeneponto CFSPP 2×125 MW. Project of PT. Bosowa Energi
  • Project Management Services for Construction of Embalut CFSPP 1×60 MW. Project of PT. Cahaya Fajar Kaltim subsidiary of Kaltim Post.


 4. PLANT REHABILITATION, COMMISSIONING, OPERATION & MAINTENANCE

  • Advisor for Construction & commissioning of South borneo CFSPP 2×65 MW. Project of PT. Wijaya Karya.

 5. TECHNICAL ADVISORY IN PLANT PERFORMANCE MEASUREMENT & ENHANCEMENT

  •  Consultancy Service in Provisioning study of Exploring the Alternatives fuel Technology, for Senayan Diesel Generated
    Power Plant,
  •  Tambak lorok Coal Fired Steam Power Plant, Pesanggaran Diesel Generated Power Plant.
  •  Technical Assistant appraisal services for judgement the use of cube
  •  Management consultancy services for flood control design on UBP Priok